Wednesday, March 26, 2008

Day 9 - Prepare for planks!

The TimberTech XLM planks arrived as did the railing and balluster sets. 2x4 pieces were put in place between each joist along the perimeter of the deck to allow for extra support for fastening down the deck planks.

All of the post hole concrete footings were covered with dirt. Our minds are racing about what we are going to do with under the deck, we have a lot of space.



No comments: